March 7th, 2014 has been set as the Project Curacao deployment date in Curacao. The box will fly down with us in checked luggage with the batteries removed. We will provide the TSA with a description of the box (it is bound to be inspected) and articles that we have written about the project. A friend of ours has flown technical gear many times and always provides a list of materials and what are the devices in the luggage. He has even gotten thank you notes from the TSA.
Here is a picture of the tower to which Project Curacao will be attached. The camera will certainly have a good view.
We have to work out an attachment mechanism as the flat of the tower does not face directly south and we want to be facing south to maximize the solar power.
No comments:
Post a Comment